BR013

Erosion stone armored trench stretching from the top of the hill and down around the corner of Brackett Road.  The road was graded and pitched into the trench to contain runoff.

At the end of the armored trench is a 8 foot deep sump catch basin.  This BMP captures runoff and allows the settling out of sediment into the basin.  When the basin captures enough sediment it can be cleaned.  As the runoff water gets high enough in the catch basin it flows through a culvert to the other side of the road and into a detention basin.

The detention basin captures the remaining runoff and sediment and infiltrates it into the ground so that clean water enters the stream.